盤時傳感器是否被撞過;檢查出現(xiàn)問題之前是否使用了軟件的校準(zhǔn)或標(biāo)定功能;檢查是否手動更改過校準(zhǔn)值、標(biāo)定值或硬件參數(shù)中的其他信息。
解決方案是檢查接入試驗機的電源線路是否連接正常;檢查急停開關(guān)是否處于擰起狀態(tài);檢查接入試驗機的電源電壓是否正常;檢查機器插座上的保險是否燒斷,請取出備用保險絲安裝即可。
解決方案是檢查是否是15S(時間)以后設(shè)備還無法移動,因為主機開機需要自檢,大概需要15S時間;檢查上下限位是否再恰當(dāng)?shù)奈恢茫幸欢ǖ倪\行空間;檢查接入試驗機的電源電壓是否正常。
fault and solution method:
A, tensile test machine, vibration or pause the pointer
1, the clutch gear wear: the need for repair or replacement.
2, the skin friction disc washer or spring wear: need to change the skin or spring washer.
3, handle shift: to adjust the control handle, make it fit in with the alveolar.
Two, the replacement of pendulum weight when the pointer does not return to zero
1, tensile testing machine installation is not level: the level to adjust the level of test machine.
2, not only the vertical pendulum hanging weight: A. Adjust the balance weight, so that the vertical.
Three, tensile testing machine, the pendulum back a bit too fast or too slow
1, the buffer valve gear position placed improper: adjust the buffer valve to the appropriate location.
2, the hydraulic oil viscosity is too low or too high: hammer down fast swing hydraulic oil viscosity is too low, viscosity is high down slowly. Should be proper replacement of hydraulic oil viscosity.
Vittae 3, buffer valve, or hydraulic oil dirty: washing buffer valve, pipe. Replacement of hydraulic oil.
Four, tensile testing machine pointer back to zero lag or unstable
1, the pointer bearing, spindle bearing corrosion or oil: clean or replace bearing.
2, toothed bar deformation or toothed bar and gear is not engaged: straightening toothed bar or washing, dressing gear, wheel, transmission parts.
3, the buffer valve with cleaning: cleaning buffer valve.
Five, tensile testing machine showing the value of positive deviation
1, the short arm loose: the knife blade tightly.
2, swing weight lighter: give weight weight (both A, B, C weight weight).
Six, showing the value of negative deviation is the main reason of the frictional resistance between the units is too large
1, the pointer shaft bearing, bearing and power transmission parts friction resistance is too large: mainly adjustment, cleaning bearings and force transmission parts to eliminate the friction resistance is not normal.
Friction resistance on 2, chuck, driven needle leaf spring tightness and describe the adjustment device: chuck, driven needle leaf spring tightness and drawing device components. To eliminate the friction resistance is not normal.
3, the piston rod and the swing rod is connected with the flexible adjustment of both parts not connected parts. The flexible.
Seven, the driven needle stagnation or shift
Effect of 1, driven needle leaf spring elastic force or driven needle and dial friction resistance caused by the gap adjustment driven needle: the elasticity of the spring piece or driven needle and dial.
2, the driven needle are heavy alligator deviation: adjusting the weights, the balance.
Eight, showing the value of deviation is irregular
1, rack, gear oil, abrasion or burr: eliminate the rack, gear oil, burr, find out the pole difference when the contact points, and then modified tooth bar, gear; if not eliminate errors. Replace the tooth bar, gear.
2, tensile testing machine testing machine installation is not level: level adjustment.
3, toothed bar bending: alignment or replacement tooth bar, adjust the roll gap groove wheel.
Nine, computer software on-line prompt box display information overload.
The solution is to check the computer and test machine communication line is off; check the online selection of sensor is correct; check the last test or operation keys
When the sensor is knocked off; check whether the use of a software appears calibration or calibration before; check whether the manual modified calibration values, calibration information value or other hardware parameters in the.
Host ten, the power of the testing machine does not light, not to move up and down.
The solution is power line inspection access testing machine is connected properly; check the emergency stop switch is in screwed up state; power supply voltage check access testing machine is normal; check the socket on the insurance is burned off, remove the spare fuse can be installed.
Host eleven, testing machine power supply with power but the equipment can not move up and down.
The solution is to check whether it is 15S (time) after the device is unable to move, because the host boot take self-inspection, probably need 15S time; check the upper and lower limit is again appropriate position, operating space; check supply voltage access testing machine is normal.